With funding from the NRCS-PL566, Sevier County and JDE worked to prevent flooding through the construction of a flood detention basin and a conveyance channel. Flood detention basins were located in Lind Canyon, Tank Canyon, and Wood Canyon. JDE performed hydraulic and hydrologic evaluations to prepare a conceptual layout, spillway, and other ancillary facilities.
